• info@donges-steeltec.de
  • German
  • English
  • Deutsch Deutsch German de
  • English English English en
Tel: +49 (0) 06151 889-0
Donges SteelTec
  • Home
  • News
  • Company
    • Contacts
    • Facts and Figures
    • Machinery
    • Certifications
    • Sustainability
    • History
  • Building with steel
    • Services
      • Project Management
      • Planning
      • Fabrication
      • Assembly
    • Bridge Construction
      • Team
      • Product Categories Bridges
      • Viaducts
      • Railway Bridges
      • Pedestrian- and Bike Bridges
      • Waterway Bridges
    • Building Construction
      • Team
      • Railway Stations
      • Airports
      • Sports Facilities
      • Parking Garages
      • Industrial Halls
      • Logistics Halls
      • Facades
      • Power Plants
  • References
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

A3 Steigerwald Motorway

Donges Bridge Construction

Successful pylon installation on the Steigerwald motorway

Another milestone was reached on the A3 Steigerwald motorway last Wednesday: the pylons of the BW314a structure were successfully moved into position by the Donges installation team. This bridge is the twenty-first of a total of 22 planned steel structures and the first cable-stayed bridge in the project.

The pylons are technically challenging as they are inclined in two directions when viewed from above. The cross-section tapers towards the top. The pylons were assembled using two mobile cranes. Thanks to a hinged construction, the mobile cranes were then able to erect the pylons safely and precisely. There was a critical tilting moment during which the pylon swung through on the crane hook. This method made it possible to bring the pylon into a vertical position in a controlled manner and at the same time anchor it to the intended attachment points.

The bridge was planned almost exclusively with the help of 3-dimensional models, which made the construction and assembly planning much more precise.

In terms of steel construction, the BW314a structure is probably the most beautiful and challenging bridge on the Steigerwald motorway. As a cable-stayed bridge, it will attract attention above all through its architectural aesthetics.

With the successful erection of the pylons, the major project is nearing completion, at least as far as the steel construction is concerned.

The A3 Steigerwald motorway is a major infrastructure project that is of great importance for both local and national traffic.The expansion and modernisation of the route is expected to significantly improve road safety and traffic flow.

The client and the companies involved can look back with pride on the work carried out so far, which has paved the way for a modern and efficient transport artery through the Steigerwald.



6. August 2024/by Donges SteelTec News
https://donges-steeltec.de/wp-content/uploads/2024/08/BW-314a-1.jpg 1125 2000 Donges SteelTec News https://donges-steeltec.de/wp-content/uploads/2026/04/donges-logo.png Donges SteelTec News2024-08-06 10:40:552024-08-06 11:37:49A3 Steigerwald Motorway
Copyright © 2020 Donges SteelTec. All rights reserved.
  • Privacy Statement
  • Legal Disclosure
Scroll to top Scroll to top Scroll to top

Our Website is using Cookies.

AcceptSettingsReject

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Google Analytics Cookies

These cookies collect information that is used either in aggregate form to help us understand how our website is being used or how effective our marketing campaigns are, or to help us customize our website and application for you in order to enhance your experience.

If you do not want that we track your visit to our site you can disable tracking in your browser here:

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Other cookies

The following cookies are also needed - You can choose if you want to allow them:

Privacy Policy

You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

Datenschutzerklärung
Accept settingsHide notification only