• info@donges-steeltec.de
  • German
  • English
  • Deutsch Deutsch German de
  • English English English en
Tel: +49 (0) 06151 889-0
Donges SteelTec
  • Home
  • News
  • Company
    • Contacts
    • Facts and Figures
    • Machinery
    • Certifications
    • Sustainability
    • History
  • Building with steel
    • Services
      • Project Management
      • Planning
      • Fabrication
      • Assembly
    • Bridge Construction
      • Team
      • Product Categories Bridges
      • Viaducts
      • Railway Bridges
      • Pedestrian- and Bike Bridges
      • Waterway Bridges
    • Building Construction
      • Team
      • Railway Stations
      • Airports
      • Sports Facilities
      • Parking Garages
      • Industrial Halls
      • Logistics Halls
      • Facades
      • Power Plants
  • References
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

12th Merck company run

Donges SteelTec

Donges SteelTec team impresses at the 12th Merck company run

Darmstadt 13 May 2025. Our Donges SteelTec team started the 12th Merck company run with a lot of joy, team spirit and a touch of nervousness. Over 7,000 runners from more than 300 companies joined forces to create an unforgettable event that was bursting with energy and team spirit.

Whether on the short 3.5 km, the medium 5 km or the 10 km challenge – each individual gave their best. The feeling of crossing the finish line together, the cheering spectators and the positive atmosphere in the Merck Stadium at Böllenfalltor – these are moments that we will remember for a long time to come.

After the run, we celebrated this special day with a cold beer, full of pride and gratitude for our team and our joint achievement.

28. May 2025/by Donges SteelTec News
https://donges-steeltec.de/wp-content/uploads/2025/05/12.-Merck-Firmenlauf.jpg 750 1054 Donges SteelTec News https://donges-steeltec.de/wp-content/uploads/2026/04/donges-logo.png Donges SteelTec News2025-05-28 15:15:222025-05-28 15:15:5212th Merck company run

A6 Grumbachtal Bridge

Donges Bridge Construction

Grumbach Valley Bridge gap closure successfully completed

The steel assembly of the Grumbach Valley Bridge near Sankt Ingbert was successfully completed with the lifting of the last two sections of substructure 1.

The two box girder strands of the substructure comprise a total steel tonnage of approx. 2,400 tonnes. The last two sections were lifted into place from a crane position behind the abutment on the Saarbrücken side of the bridge structure. Using a 750 tonne crane, the two sections were lifted off the heavy-duty transporters, turned and then lifted into their final position. This created the conditions for concreting the carriageway slab. Donges SteelTec has thus once again demonstrated its capabilities in the construction of large bridges.


21. May 2025/by Donges SteelTec News
https://donges-steeltec.de/wp-content/uploads/2025/05/Grumbachtal-2.BA_Lueckenschluss-006.jpg 750 1333 Donges SteelTec News https://donges-steeltec.de/wp-content/uploads/2026/04/donges-logo.png Donges SteelTec News2025-05-21 07:40:232025-05-21 08:20:15A6 Grumbachtal Bridge

Change in production management at Donges SteelTec

Donges SteelTec

Dr Peter Schäfer hands over the baton to Dr Aaron von der Heyden

After 35 years of dedicated service to our company, we have bid farewell to our long-standing Production Manager, Dr Peter Schäfer, on his well-deserved retirement. We would like to express our sincere thanks for his extraordinary loyalty, his tireless commitment and his great contribution to the successful development of our production. During his career, Dr Schäfer has made a significant contribution to the technological and organisational development of our company – always with an eye for quality, efficiency and teamwork.

Our Technical Director, Dr Aaron von der Heyden, will take over the management of production in future. By closely combining technical management and production, we are creating optimal conditions for the holistic further development of our production processes and for shaping the future of our company in a sustainable manner.

We wish Dr Schäfer all the very best for his new chapter in his life and would like to thank him once again for over three decades of valuable collaboration. We also wish Dr von der Heyden every success in his new role.

9. May 2025/by Donges SteelTec News
https://donges-steeltec.de/wp-content/uploads/2025/05/Veraenderung-in-der-Produktionsleitung-bei-Donges-SteelTec.jpg 750 1412 Donges SteelTec News https://donges-steeltec.de/wp-content/uploads/2026/04/donges-logo.png Donges SteelTec News2025-05-09 17:20:382025-05-09 17:43:36Change in production management at Donges SteelTec
Copyright © 2020 Donges SteelTec. All rights reserved.
  • Privacy Statement
  • Legal Disclosure
Scroll to top Scroll to top Scroll to top

Our Website is using Cookies.

AcceptSettingsReject

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Google Analytics Cookies

These cookies collect information that is used either in aggregate form to help us understand how our website is being used or how effective our marketing campaigns are, or to help us customize our website and application for you in order to enhance your experience.

If you do not want that we track your visit to our site you can disable tracking in your browser here:

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Other cookies

The following cookies are also needed - You can choose if you want to allow them:

Privacy Policy

You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

Datenschutzerklärung
Accept settingsHide notification only