• info@donges-steeltec.de
  • German
  • English
  • Deutsch Deutsch German de
  • English English English en
Tel: +49 (0) 06151 889-0
Donges SteelTec
  • Home
  • News
  • Company
    • Contacts
    • Facts and Figures
    • Machinery
    • Certifications
    • Sustainability
    • History
  • Building with steel
    • Services
      • Project Management
      • Planning
      • Fabrication
      • Assembly
    • Bridge Construction
      • Team
      • Product Categories Bridges
      • Viaducts
      • Railway Bridges
      • Pedestrian- and Bike Bridges
      • Waterway Bridges
    • Building Construction
      • Team
      • Railway Stations
      • Airports
      • Sports Facilities
      • Parking Garages
      • Industrial Halls
      • Logistics Halls
      • Facades
      • Power Plants
  • References
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

A7 Thulba viaduct

Donges Bridge Construction

Donges SteelTec receives order for the replacement of the Thulba viaduct

The bidding consortium Adam Hörnig GmbH and Donges SteelTec GmbH has been awarded the contract for the replacement of the Thulba viaduct. This involves two superstructures for the A7 motorway bridge between Würzburg and Fulda in the Bad Kissingen/Oberthulba section of the motorway. The bridges, each with a total length of 460 m, up to 53 m above the valley, will cross the A7 over the Thulba as well as various forest and farm roads.

The replacement for the 7-span bridge, which was completed in 1968 and is now to be demolished, is a steel composite bridge that is pushed in lengthwise. The steel construction tonnage amounts to a total of 6,000 tons. “We are very proud to have been awarded the contract together with our long-standing partner, Adam Hörnig GmbH”, said Stephan Langer, Managing Director Bridge Construction of Donges SteelTec GmbH. “Such particularly challenging structures are our hobbyhorse and we are delighted to be able to help design such magnificent bridges”. The client is the Autobahnamt Nordbayern, for whom Donges SteelTec has already built the Heidingsfeld and Breitengüßbach viaducts. Construction will start in the autumn of 2020; the construction time is estimated at around six years.

15. September 2020/by Donges SteelTec News
Tags: News
News teilen
  • Share on X
  • Share on WhatsApp
  • Share on LinkedIn
  • Share by Mail
https://donges-steeltec.de/wp-content/uploads/2020/04/Talbruecke-Thulba_Animation_fern.jpg 483 1128 Donges SteelTec News https://donges-steeltec.de/wp-content/uploads/2026/04/donges-logo.png Donges SteelTec News2020-09-15 09:30:122020-09-15 09:33:18A7 Thulba viaduct
You might also like
A3 Steigerwald Motorway
Construction Site Update from the Pfaffendorf Rhine Bridge in Koblenz
12th Merck company run
Our construction site containers have a new look!
Installation Launch in Linz
MERCK Stadium at Böllenfalltor
Donges SteelTec
Lifting in the new foot and cycle path bridge over the B426 in Mühltal
Copyright © 2020 Donges SteelTec. All rights reserved.
  • Privacy Statement
  • Legal Disclosure
Link to: Career start at Donges SteelTec Link to: Career start at Donges SteelTec Career start at Donges SteelTec Link to: Jubilare 2020 Link to: Jubilare 2020 Jubilare 2020
Scroll to top Scroll to top Scroll to top

Our Website is using Cookies.

AcceptSettingsReject

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Google Analytics Cookies

These cookies collect information that is used either in aggregate form to help us understand how our website is being used or how effective our marketing campaigns are, or to help us customize our website and application for you in order to enhance your experience.

If you do not want that we track your visit to our site you can disable tracking in your browser here:

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Other cookies

The following cookies are also needed - You can choose if you want to allow them:

Privacy Policy

You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

Datenschutzerklärung
Accept settingsHide notification only