DHL Air Hub Leipzig

Expansion of DHL Logistics Center Air Hub at Halle-Leipzig Airport

Project
Expansion of the DHL Air Hub Leipzig with a platform area on the mezzanine level +5.3m, platform area on the SNCY level +12.6 m and a canopy

Owner
Deutsche Post DHL
04158 Leipzig, Germany

Steel construction for a 60,000 m² platform area and a 6,300 m² canopy.

Platform area 60,000 m²
Canopy area 6,300 m²

ARGE Erweiterung DHL, Air Hub (Consortium)
04105 Leipzig, Germany

Execution planning as well as delivery and assembly of the steel construction.

Construction period 2014 – 2017