Volkach bridge over the River Main
Composite tied-arch bridge
Project
New construction of the River Main crossing near Astheim-Volkach as part of state roadway St2260.
Owner
Staatliches Bauamt Würzburg (State Building Office)
97070 Würzburg, Germany
Project description
The river bridge was designed as a tied-arch deck bridge with vertical supports and composite roadway slabs. The steel structure was completely pre-assembled on the shore, then moved to its final position using self-propelled platform trucks and floated into place with pontoon support. The roadway slab was made of cast-in-place concrete.
Technical specifications
Bridge length: 120.00 m
Spans: 120.00 m
Bridge width: 12.65 m
Bridge class: LM1
Steel S355 / J2G3 880 t
General Contractor
ARGE PPP Volkach (Consortium)
Adam Hörnig Baugesellschaft mbH & Co. KG
63741 Aschaffenburg, Germany
Donges SteelTec GmbH
64293 Darmstadt, Germany
Service
Donges manufactures, delivers and assembles the complete steel structure including corrosion protection.
Construction period
Construction period 2010