• info@donges-steeltec.de
  • German
  • English
  • Deutsch Deutsch German de
  • English English English en
Tel: +49 (0) 06151 889-0
Donges SteelTec
  • Home
  • News
  • Company
    • Contacts
    • Facts and Figures
    • Machinery
    • Certifications
    • Sustainability
    • History
  • Building with steel
    • Services
      • Project Management
      • Planning
      • Fabrication
      • Assembly
    • Bridge Construction
      • Team
      • Product Categories Bridges
      • Viaducts
      • Railway Bridges
      • Pedestrian- and Bike Bridges
      • Waterway Bridges
    • Building Construction
      • Team
      • Railway Stations
      • Airports
      • Sports Facilities
      • Parking Garages
      • Industrial Halls
      • Logistics Halls
      • Facades
      • Power Plants
  • References
  • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Reconstruction of the Ahrtal railway

Donges Bridge Construction

Donges SteelTec manufactures and assembles the steel structures for nine railway bridges

In the course of the flood disaster in July 2021, large parts of the Deutsche Bahn rail network in the Ahr valley were destroyed. Now, bridges and railway embankments along the route are to be rebuilt in a highly water-resistant manner. The main focus is on the bridges. The former round arch bridges are to be given a slimmer construction during the reconstruction in order to offer the (flood) water as little surface of attack as possible.

Donges SteelTec has been commissioned to manufacture, deliver and assemble the steel structures (4300 t) for nine steel trough bridges. The contract also includes workshop and assembly planning as well as all corrosion protection services, bearings, transition structure and railings.

We are pleased to be able to contribute to the reconstruction of the Ahr valley and are convinced that the decision to build the new bridges sustainably in steel construction is an additional measure to increase resilience against possible future flood events.

 

4. August 2023/by Donges SteelTec News
Tags: News
News teilen
  • Share on X
  • Share on WhatsApp
  • Share on LinkedIn
  • Share by Mail
https://donges-steeltec.de/wp-content/uploads/2023/08/Ahrtalbahn.jpg 636 1000 Donges SteelTec News https://donges-steeltec.de/wp-content/uploads/2026/04/donges-logo.png Donges SteelTec News2023-08-04 10:15:152023-08-04 10:52:29Reconstruction of the Ahrtal railway
You might also like
New trainees at Donges SteelTec
With two bridges through the city.
EÜ Steinach, Balingen
Boys and Girls Day at Donges SteelTec
Engineering performance at its best!
Riederich railway overpass
Pedestrian and Bicycle Bridge Rheinstraße, Darmstadt
A7 Voest Viaduct in Linz
Copyright © 2020 Donges SteelTec. All rights reserved.
  • Privacy Statement
  • Legal Disclosure
Link to: BW3-1 Overfly Link to: BW3-1 Overfly BW3-1 Overfly Link to: PTS at Frankfurt Airport Link to: PTS at Frankfurt Airport PTS at Frankfurt Airport
Scroll to top Scroll to top Scroll to top

Our Website is using Cookies.

AcceptSettingsReject

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Google Analytics Cookies

These cookies collect information that is used either in aggregate form to help us understand how our website is being used or how effective our marketing campaigns are, or to help us customize our website and application for you in order to enhance your experience.

If you do not want that we track your visit to our site you can disable tracking in your browser here:

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Other cookies

The following cookies are also needed - You can choose if you want to allow them:

Privacy Policy

You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

Datenschutzerklärung
Accept settingsHide notification only